Premier Duct Access Chamber
Plastech is proud to introduce it's new product, the Premier duct access chamber. Although it is aimed primarily at the Street Lighting and Traffic Signals industries, it is suitable for most applications where a duct access chamber is required.
The PREMIER Box has been tested to B125, 12.5 Tonne wheel loading and is therefore suitable for most installations with or without concrete surround, a saving on excavation and concrete costs to the contractor and client.

POLEBOXES
Robust design means that the boxes are not prone to deformation whilst being backfilled with concrete unlike some other systems currently on the market giving contractor and client, piece of mind.
150mm deep sections means greater flexibility of installation and no more slicing the tops of chambers to try and get them to fit in the hole
= LESS WASTAGE.

Previous page: Engineering Drawings
Next page: Installation Guide